Material & Waste Management
Total Inventory Value
$1.2M
Across all sites
Waste Rate
4.2%
+0.5% from last month
Stockout Alerts
3
Immediate action required
Overstock Value
$55K
Potential carrying costs
Digital Inventory Dashboard
Real-time stock levels for Downtown Skyscraper.
| Material | Category | Stock | Location | Status | Expiry | |
|---|---|---|---|---|---|---|
Structural Steel Beams STL-001 | Structural | 25 Tons | Yard A | In Stock | N/A | |
Portland Cement (Type II) CEM-003 | Concrete | 500 bags | Silo 2 | In Stock | 2024-09-15 | |
12-Gauge Electrical Wire WIR-007 | Electrical | 5 rolls | Warehouse 1, Bay 3 | Low Stock | N/A | |
1/2" Drywall Sheets DRY-002 | Finishes | 150 sheets | Floor 5 | Ordered | N/A | |
4" PVC Pipe PIPE-015 | Plumbing | 80 lengths | Yard B | In Stock | N/A |
AI-Powered Forecasting
Usage Forecast
Next 7 days: 120 sheets of drywall and 50 bags of cement required for Floor 6 fit-out.
Over-ordering Alert
P.O. #582 for 300 rolls of electrical wire exceeds forecast by 40%. Recommend reducing order to 180 rolls.
Loss Minimization
Storage Conditions
Silo 2 Humidity: 45% (Optimal)
Normal
FIFO Alert
Use cement from Batch #C-08 (Expires Aug 30) before Batch #C-12.
Usage vs. Waste Analytics
| Material | Wasted Amount | Reason | Action |
|---|---|---|---|
| Drywall Sheets | 15 sheets | Water Damage | |
| Portland Cement | 20 bags | Expired | |
| Structural Steel | 0.5 Ton | Cutting Error |