Design Management

Design Phase Overview
Current status and progress of the design phase.

Schematic Design

Current Phase

85%

Phase Progress

3

Open RFIs

1

Pending Change Request

Recent Design Documents
IDNameStatus
ARC-201Schematic Design Package
Approved
STR-105Foundation Calculations
Under Review
MEP-302HVAC Layout - Level 5
Draft
Value Engineering
Track cost-saving ideas and their impact.
IdeaCategoryEst. SavingStatus
Substitute facade materialMaterials$55K
Under Review
Optimize rebar scheduleMethod$120K
Approved
Use pre-fabricated bathroom podsMethod$250K
Rejected
Design Brief

Type: Mixed-Use Commercial

Floors: 25

Key Requirement: LEED Gold Certification

Design Team
B

BuildRight Architects

Lead Architect

I

Innovate Engineering

Structural Engineer

F

Flow Dynamics

MEP Consultant

U

UrbanScapes

Landscape Architect