| ID | Description | Asset | Priority | Status | Assigned To | Due Date | |
|---|---|---|---|---|---|---|---|
| WO-001 | Seal leak detected, replacement required. | Water Pump (PMP-03) | High | Open | JJohn Doe | 2024-08-05 | |
| WO-002 | Annual safety inspection and cable lubrication. | Elevator Car #2 (ELEV-02) | Medium | In Progress | JJane Smith | 2024-08-10 | |
| WO-003 | Quarterly filter replacement and system check. | Air Handling Unit (AHU-01) | Medium | Open | BBob Johnson | 2024-09-15 | |
| WO-004 | Infrared scan and breaker testing. | Main Switchgear (SWGR-01) | Low | Completed | AAlice Williams | 2024-07-20 | |
| WO-005 | Refrigerant level check on hold pending parts. | Chiller Unit 1 (CHLR-01) | High | On Hold | JJohn Doe | 2024-08-12 |